|
The Covered Bridge Gateway Trail

Contents
Executive Summary -- CBGT Final Report
Documents -- CBGT in the News
Related Links -- Contact Information --
Disclaimer
Executive Summary
To expand the network of shared-use trails in
western Indiana, the West Central Indiana Economic Development District (WCIEDD)
wishes to acquire the abandoned Penn Central Railroad Crawfordsville Branch
(between North Terre Haute and Rockville) and transform it into a pedestrian/bicycle
greenway trail. A connection between these two cities will permit recreational
access to a long stretch of rural Parke and Vigo Counties and boost tourism in
conjunction with Parke County’s Covered Bridge Festival. Wabash Valley Rail-Trail
Consulting (WVRTC) (see Disclaimer) was asked by WCIEDD to investigate
the current condition of the right-of-way and perform a design for the proposed
trail.
The seventeen-mile right-of-way is aligned north-northeast
from Otter Creek Junction to Catlin, at which point it turns north and follows the
Sunderland Branch of Little Raccoon Creek to Rockville. Since being abandoned in
the early 1970’s, about half of the right-of-way has been sold by the railroad
holding company to private landowners. About half of the right-of-way has become
overgrown, while the rest either remains open or has been reclaimed for agricultural
use. Most bridges have deteriorated or been entirely removed.
Responding to requests from the client, WVRTC designed
a trail conforming to ADA specifications and federal guidelines. The overall trail
design included specification of the typical trail cross-section, site designs of
trailhead facilities, trail design, and a phased construction plan. Trailheads will
be located in Rockville, Catlin, Rosedale, and North Terre Haute. The North Terre
Haute trailhead site is Markle Mill Park, and a connection to Otter Creek Junction
will be provided by 1.6 miles of trail constructed along Rosedale Road and upon the
abandoned Chicago & Eastern Illinois Railroad (Brazil Branch). WVRTC also
performed primary structural element designs for two bridges, a timber covered
bridge crossing Bridgeton Road in Rockville and a timber trestle spanning Sunderland
Branch of Little Raccoon Creek north of Catlin.
Trail construction is estimated to cost $3,270,000,
which includes clearing and grubbing, small-span bridge improvements, road crossings,
and trailhead construction. The timber trestle is estimated to cost $16,300, and
the covered bridge is estimated at $58,100.
CBGT Final Report Documents
Right-click and choose Save As... to download each file to your hard drive.
The report documents are presented in Adobe PDF format and require the
Adobe Acrobat Reader
to view the files.
Full Report
Covered Bridge Gateway Trail Final Report (89.8 MB, see note below)
This large file contains the body and all of the appendices, plus the drawings and larger figures.
If the report is too large, individual parts can be viewed separately below.
Individual Parts
Report Body (11.2
MB)
Appendix A: Property Ownership (57.3 MB, see note below)
Appendix B:
Photographic Survey (9.5 MB)
Appendix C: Markle Mill Park Trailhead Development Envelope (1.0 MB)
Appendix D: Codes and
Regulations (132 KB)
Appendix E: Site
Surveys (89 KB)
Appendix F: Hydrologic and Hydraulic Study (538 KB)
Appendix G: Sunderland Branch Soil Investigation (424 KB)
Appendix H: Bridge
Design Options (1.8 MB)
Appendix I:
Assessment of Design Options (145 KB)
Appendix J: Bridgeton Road Covered Bridge Loads (538 KB)
Appendix K: Bridgeton Road Covered Bridge Member Design (232 KB)
Appendix L: Sunderland Branch Trestle Design (252 KB)
Appendix M: Trail Design
(1.2 MB)
Appendix N: Trailhead
Layout (541 KB)
Appendix O:
Overall Trail Alignment (4.3 MB)
Appendix P:
Estimated Trail Costs (216 KB)
Note: The full report and Appendix A files are no longer permanently hosted
on this site due to size constraints. If you need either of these files, please email
Dave Honan or
Pat Martin to arrange for their availability.
The CBGT in the News
Articles published after the completion of the project
"Hope Running Out for Five Major Rail-Trail Projects"
-- Hoosier Rails-to-Trails Council News, May 26, 2005
"Trail Blazers - Civil Engineering Seniors Design Proposed
18.5 Mile Covered Bridge Gateway Trail"
-- Rose-Hulman News, May 19, 2005
"Trail project would link North Terre Haute to
Rockville"
-- Terre Haute Tribune Star, May 5, 2005
Related Links
Hoosier Rails-to-Trails Council
Parke County, Inc.
Rose-Hulman Institute of Technology
Vigo County Parks Department
West Central Indiana Economic Development District
Contact Information
Pat Martin - Chief Planner, City of Terre Haute
Dr. Robert Houghtalen - Professor and Head of Civil Engineering, RHIT
Dr. Jim McKinney - Professor of Civil Engineering, RHIT
Disclaimer
The contents of this report were prepared by senior civil engineering students
in the design and synthesis class of Rose-Hulman Institute
of Technology. Wabash Valley Rail-Trail Consulting is a fictitious company created
by seniors Philip Griffith, David Honan, Travis McKittrick, David Pirnia, and Andrew
Twarek for the purpose of this class. We feel confident in our work as students, however
you should be aware that we are not registered professional engineers. All material
presented herein should be reviewed and approved by a professional engineer prior to
construction.
this site is proudly hosted by David Honan, RHIT CE Alumnus 2005
last updated: 01/02/07 DWH

visitors since 05/23/05
counter courtesy www.digits.com
|